Agrod Inter-Connecting Line Project
The fruitful cooperation between Petroleum Projects and Technical Consultations Company (PETROJET) and Emaar Misr continued in the Agrod inter-connecting Line Project.
The project consisted of a number of challenges between highways at which the works should be executed perfectly without disrupting the traffic, as well as work nearby military areas that required order, precision and swiftness in execution. All these are privileges held by Emaar Misr’s team and works were:
- Two 1,200m crossings in length and 32 and 36-inches in diameter
- A 582m steel crossing in length and 32-inches in diameter under the Cairo-Suez highway
- Crossing a battalion located at kilometer 17.25 on the Cairo-Suez highway with a diameter of 32-inches and a length of 588m
- A 32-inch diameter and 766m length crossing, under the Suez railway that runs parallel to the Cairo-Suez highway, at kilometer 100.10