The project involves the construction of intersections for the Ministry of Agriculture, including developed and undeveloped drains, unregulated canals, and main and secondary drains, in conjunction with the agricultural and treated wastewater transfer route in a new reclamation project along the Dabaa axis in West Delta.
Due to precision and adherence to the timeline, the Egyptian Armed Forces Engineering Authority has entrusted the execution of this project to Emaar Misr for Contracting.
The project includes horizontal directional drilling (HDD) of various diameters and lengths, as well as open excavation for connections, construction of concrete pits of varying internal diameters (1.5m, 2m, 3m), installation of concrete intake structures, and protective iron networks. It also involves the installation of control valves and UPVC pipes in various sizes, all executed according to the required specifications.